İncirli Reservoir and Hydroelectric Power Plant
The brief summary of the project:
INCIRLI Regulator and HEP Generation Facility in Rize province Kalkandere district was commissioned on 26 May 2011.
Project Details
Project Type
Design – Build – Operate
Project Start
1 March 2008
Project End
1 May 2011
Project Location
Rize, TURKEY
Owner
Laskar Enerji Üretim Pazarlama A.Ş.
Contract Value
$ 61,200,000.00

Key Project Quantities:
- Water Transmission Line (L=223 m, D=5.50 m)
- Water Intakes And Settling Basin (3 Nos 6.00×3.50 M Vertical Inlet Gate)
- Drill and Blast Water Tunnel (L=6570 m, D=4.50 m horse-shoe lined tunnel)
- Surge Tank (D=18 m, H=64 m circular section, steel lined reinforced concrete)
- Penstock (L=84 m, D= 3×1.50 m circular section, embedded in reinforced concrete underground)
- Power Plant (3 units, each 8.40 MW, total installed capacity is 25.20 MW, 126,000,000 KWh/year energy production)
- 500,000 m3 earthworks