Jurf and Saay Channel Project includes the construction of 22 km long trapezoid sectional drainage channels in total. Jurf Channel flows from west to south, and then turns west and ends at the sea. Jurf Channel designed with a variable bed width of 340 m to 650 m. Saay Channel flows south to north till the junction with Jurf channel and designed with a variable bed width of 90 m to 320 m. The JV was operating as a part of the project a crushing operation at Duqm with capacity of over 2 Million Tons per year with 4 products output.
The crushing operation comprised of a stationary, as well as mobile crushing operations. This operation was extensively studied and designed for this project requirements and needs.
As of January 2018, 697 employees were working and 36 excavators, 20 loaders, 16 dozers, 17 graders, 160 trucks, 15 rollers and various heavy equipment were allocated on site.