İncirli Reservoir and Hydroelectric Power Plant

İncirli Reservoir and Hydroelectric Power Plant

INCIRLI Regulator and HEP Generation Facility in Rize province Kalkandere district was commissioned on 26 May 2011.

Key Project Quantities:

  • Water Transmission Line (L=223 m, D=5.50 m)
  • Water Intakes And Settling Basin (3 Nos 6.00x3.50 M Vertical Inlet Gate)
  • Drill and Blast Water Tunnel (L=6570 m, D=4.50 m horse-shoe lined tunnel)
  • Surge Tank (D=18 m, H=64 m circular section, steel lined reinforced concrete)
  • Penstock (L=84 m, D= 3x1.50 m circular section, embedded in reinforced concrete underground)
  • Power Plant (3 units, each 8.40 MW, total installed capacity is 25.20 MW, 126,000,000 KWh/year energy production)
  • 500,000 m3 earthworks

Project Details

Share This

  • Project TypeDesign – Build - Operate
  • Project LocationRize, TURKEY
  • OwnerLaskar Enerji Üretim Pazarlama A.Ş.
  • Project StartMarch 2008
  • Project EndMay 2011
  • Contract Value61,200,000.00 $