The brief summary of the project:
Project consisted of the design and construction of a new strategic airlift ramp. Project scope included topographic surveys and geotechnical studies, 100 % preparation of plans and specifications, demolitions, site preparation, and construction of concrete and asphalt paved areas, electrical work, and open drainage system.
Project Details
Project Type
Owner
Project Start
Project End
Contract Value
The scope of the work
Replacing the steel structure, removal of existing metal roof and cladding, external and internal walls, windows, doors and replacement with the designated sandwich panel, removal of existing in-use facilities such as office rooms, kitchen, and wet area are included in the scope of this project. Renovation of facilities that are inside of the building, according to the approved design including all architectural, electrical & mechanical, HVAC works, car lifting, plumbing, mass notification, fire alarm system, heating system installations are being carried out under this Contract.
The project is also including the landscaping and pavement works around the Motor Pool Building including earthworks and perimeter asphalt replacement.
The project scope includes below items but not limited to:
- Demolition of existing pavement, slabs, foundation, walls, steel structure, utilities and landscaping.
- Earthwork and grading as necessary for the construction of new structure and pavement.
- Construction of R/C footing foundations.
- Fabrication, delivery and installation of structural steel frame.
- Construction of sandwich panel roof and façade.
- Construction of masonry walls and aerated concrete walls.
- Design and construction of site drainage facilities as well as adaption of existing site drainage.
- New construction of site utilities as well as relocation / protection of existing utilities.
- Construction of new asphalt pavement for vehicle circulation area.
- Installation of crash protection bollards.
- Installation of a new Heating system including fuel tank, boiler, circulating pump, radiators, etc.
- Installation of a new HVAC system including Outdoor Units, Air Processing Units, Exhaust Fans, A/C units, Ducts.
- Installation of a new Domestic Water system and Waste Water system.
- Installation of a new Compressed Air System.
- Installation of sanitary accessories and kitchen furniture.